Basic Installation Spec

 
 
 
 
 
BASIC INSTALLATION
1. Install treated floor bearers to customer's correctly prepared base
2. Install first logs checking the diagonals, attach to bearers with screws
3. Build up cabin using wall plans, inserting doors/windows when appropriate
4. Build up to eaves height
5. Build up apexes to ridge height
6. Install the roof purlins to apex with screws
7. Install roof boards to roof purlins with nails
8. Attach eaves facia boards
9. Install floor boards to floor bearers with nails
 (sometimes this is not done so that the customer can fit electric cables etc under the floor)
10. Attach all window trims to window frames
11. Check windows and doors open correctly
 
SHINGLES INSTALLATION
 
1. Install roof shingles to roof boards with clout nails
 
2. Install ridge shingles 
 
2. Attach facia boards to apexes and roof
 
(sometimes this is not done so that the customer can paint them more easily)
 
PLEASE NOTE:
 
Our installation quotations do not include disposal of cabin packaging materials. 
We can quote for this separately if required. 
 
 
 